Tagged: 

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #16001
    esailor Team
    Keymaster

    Vrushank Gimnokar GMA Candidate 2/E Unlimited Orals on line
    Examiner Mr Smith from Hull 07.01.2021
    1, your last ship
    2, he showed a series of drawings on his screen and asked to identify the components as marked
    As well as describe and cross questions also.
    a, draw cards
    b, draw card with late injection
    c, co2 system(asked maintenance carried out)
    d. electrical diagram of turning gear motor
    e, power card points
    3. enclosed space entry
    4. F.O Quality report and name all components in the report
    5, cold corrosion
    6, boiler water treatment
    7, chlorides high in boiler water
    8.ANNEX VI explain
    9. fuel pump timing
    10, 4 stroke piston and piston ring overhaul and checks and clearances
    11.4 stroke bottom end bearing and bolts
    12. cat fines explain what to do if high in fuel oil report

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.