Tagged: 

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #16478
    esailor Team
    Keymaster

    Hi i had a oral mr fazal wadood is come to take my oral
    Time 11:30 to 13:02
    Loadline survey
    Ism isps ad mlc survey preparation
    Join as mate ship is preparion for lod grain what info u take from out going chief off and what info u share with second off
    Route from singapore to south corea in bad weather have some damaged now company descide for emergency drydock. Preparation
    (Forget to mention docking plan and GA plan)
    Declaration of security
    Gyro failure
    U r kne watch 5 in morning see in fire panel one zome show fire alarm …action
    Later start bouyage
    Light
    Cardinal mark
    During light show one by one many light almost 11-12 but in last he give pdv and on port side Towing Ram ….crosing by mistake i give five short blast this is the failjng point ….
    Failed

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.