Tagged: Muhammad Iqbal
- This topic has 0 replies, 1 voice, and was last updated 5 months, 1 week ago by
esailor Team.
-
AuthorPosts
-
April 23, 2025 at 3:03 pm #16540
esailor Team
KeymasterChief mate Unlimited /Master 3000 GRT
Muhammad Iqbal
1 Hour 45 minutes 1st Attempt Fail
AUG/ 2023 – Online
He joined 2 minutes before and started with conduct of the exam. What vessel and company,trading area and rank sailed on last ship.
1. Joining as chief mate from berth in your last vessel.
2. What document you will handover to master on uk flag vessel.
3. How you going to take over from chief mate
4. What all statutory certificate in your last ship.
5. Hssc and ACS WHAT MCA DOES?
6. EAS,Selected ships,Standard risk and high risk
7. ISM Certification and smc
8. Interim doc validity.
9. Dry dock inspection How often carry out.
10. Shipper called master to load maximum coal. How you will go for it.
11. DGDOC and Why you need Air draft.
12. Stability of vessel during loading what you will check.
13. What is Mate rcpt .
14. Loaded less cargo ur actions.
15. Annex-1 ,IOPP and form A
16. Annex 6 certificate in detail
17. Load line survey and certification, ship A and criteria.
18. FWA AND DWA
19. ISSC certificate And SSP
20. What is CSR.
21. When will you get another CSR.
22. BW Exchange procedures and sequential method. Stresses in rought wx.
23. Parametric and synchronise rolling.
24. UK stand on bw exchange.
25. UK Legislation ,M Notices,MSN MIN MGN.
26. Rest hrs and youg person rest hours.
27. TRS action of prudent master and signs.
28. Northern hemisphere in TRS
29. Lost Radar Xband.
30. Who gives dispensation.
31. Strg become sluggish pilot on board
32. Squat effect, how you will deal.
33. Grounding actions.
34. 20 year old vessel psc inspection.
35. Expended psc inspection.
36. Paris Mou PSC
37. Prohibited notice ,NC
38. Drill schedule
39. Some thing hit in ur watch nothing in radar.Dangerous derelict solas ch5
40. Collision with fv actions and rescue.
41. Dry dock preparation as chief mate.
42. Critical period,critical instant,Pforce
43. Surveyor want Enclose space entry. Procedures of enclose space entry.
44. Refloating dry dock checks
45. Ship list heavily in dry dock.
46. Fire in Engine Room in Dry dock .
47. Who will decide to release CO2.
48. After dry dock Prepare for load cargo.
49. Deep sea anchoring.
50. Life boat 5 yearly test.
51. Magnetic compass Daviation high in Easterly heading.
52. Magnetic compass error.
53. GPS failure what u will do. Celestrial observation how you will take teach to cadet.
54. What you do with P/L and intercept.ROR Situation & Lights All Animated Slide all time you are in PDV (1st answer is your last answer)
1) CBD Vessel crossing from Port side in TSS.
2) FV Crossing from Port side in TSS.
3) Vessel Less than 20 mtr crossing from Stbd side in PDV on you port side open sea .
4) Towing with RAM Tow length more than 200 mtr Port side.
5) Towing vessel with diamond on tow in day time.
6) Trawler vsl hauling nets.
7) Fv gear extended 150m .
8) Vsl aground less than 100m and more than 100m
9) Nuc seen endon
10) PDV crossing from port to sbd
11) Towing crossing stbd to port
RV
Make woa triangle ur self .guide him to put the w in right place. Extend the oa line for roc.
1)VSL ON STBD QUARTER.
2)VSL ON STBD QUARTER AND SBD BOW RECIPROCAL COURSE
3)VSL ON PORT AND SBD bow roc with both
Buoyage
Safe water mark
Strg 180 west cardinal
Isolated danger mark
Emergency wreck buoy
Special mark
East cardinal buoyROR FAILING POINTS
Stand on with caution for CBD in tss
Rv vsl on stbd quater and stbd bow reciprocal slow down he didn’t likeCBD was in opposite lane crossing
When I extended oa line I said it looks like a close quater situation will devolp .so I can not alter course port for vsl fwd of the beam and I will avoid alteration of course towards vsl abaft the beam as per 19d
So I will slow down
He said can u do anything other than this .said can go to port.At last surveyor mentioned it was 1 mile range rings if u extend oa it was more than a mile
-
AuthorPosts
- You must be logged in to reply to this topic.