Tagged: 

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #16592
    esailor Team
    Keymaster

    Examiner phill bulman 1 hour 10 mins Roles responsibilities and where would I find these What is the sms and what would you find in sms as per chapters What procedures you would expect to find in the sms Full bunker procedure from start to finish off what would be done after bunkering- orb What would be my responsibilities to people working in the engine room and what sort of things expected-mlc work conditions rest hours giving rest to people, mentioned training aswell Someone has complaint to you what would be first steps to resolve it what would happen if initial step didn’t resolve it-sms mlc complaints procedure Talk me through Draw cards what were issues and how to rectify issues Low pressure diagram said what can this lead to in large two stroke mentioned after burning exhaust vv failure and deposits in scavange space leading to fire Said one unit has suspected fire high temp actions when you can stop-lift fuel pump shut fuel valve run low load ad possible monitor he was happy Fuel pump gets stuck during fuel changeover what would be my actions Talk through full job of full pump replacement New pump in noisy what could it be-timing how do I check this he showed me drawing i explained from drawing he then asked me when does Injection start and stop – explain helix Bdn check fuel high vanadium what issue can this cause- mixed with sodium hot corrosion exhaust system failures Transformer hv and lv side full isolatons and hv testing full procedure for isolation he didn’t mention any meggar test stopped when I got to the point work ready to be carried out with permit filled Sewage plant explain Operation What gases are present smell of egg Risk to human safety led to needing to go inside a large one on cruise ship- went into full enclosed space permit
    Iaap certication- what documentation is part of it nox etc what components are under it then said anything else outside of this I mentioned gas log He moved to refrigeration chef mentions low temps after contractor being on what would I go check what could be the issues how would I go about rectifying it and then what to do after job completion if air how do I remove Asked eexi eedi Star delta diagram why we use these starters explain the diagram how it works Switchboard Safeties Explain how generator provided electricity and how it is regulated Explain the avr Emergency generator sending 3rd engineer up to start what would you do or go about it before hand- print procedures run through check list ask questions make sure he understands what needs to be done if he had any questions Pre start checks On load test explain what you do to test mentioned 45s online Belt failure talk me through going through the job loto permit etc now you have wrong belt what is your next steps master wants to step-inform dpa conditon of class etc All I can remember examiner was good pushed me into a few things when I had hit some blanks

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.