Viewing 1 post (of 1 total)
  • Author
    Posts
  • #16650
    esailor Team
    Keymaster

    Candidate: Jonathan Faragher
    Examiner Phillip Bullman
    Date 25/03/25
    Duration: 60 Minutes
    Started off with usual formalities, then asked for a brief background of my experience (cadetship on cargo ships and EOOW onboard cruise ships)
    The examiner is friendly, told me at the start that if he asks something and I don’t know then to tell him and he can reword the question or we will move on, not to guess. I found that he would ask me something and let me talk and then he would probe me for more if he wanted it.
    1. New second joining a ship, what are and where can I find my responsibilities

    Discussed SMS for specific duties both in work and for emergencies, plant maintenance, recordings and training exercises

    Assisting chief engineer and overseeing management of engineering department

    Plant operations and maintenance for all equipment

    Maintaining record keeping, PMS & documents like ORB

    Overall support for department both in and outside of work
    2. He then asked what else is included within the SMS that is useful

    Information on DPA

    Specific checklists for ship operations

    Defining ranks for people and familiarisation

    Safety and environmental policy
    3. He then said I am the designated safety officer onboard what are my duties outside machinery

    Drills being performed as per COSWOP and recorded

    Safety culture onboard

    Investigating near misses and corrective action

    Safety equipment maintained
    4. What specific technical certificates are onboard and their validity

    Mentioned MARPOL and certificates for annex 1,4,6
    5. Then asked for details with them all

    MARPOL Annex 1 responsibilities as a 2EO, plant and discharge regulations and locations we cannot do it (Antarctica)

    Annex 4 plant and discharge regulations

    Annex 6 what is involved NOX, SOX ODS records for them, their limits

     Annex 6 he asked for reduction systems for NOX I mentioned we have a water fuel emulsification unit and how it works. He then asked if we have any scrubbers, I told him we have open loop type, and he asked if we can use them in America
    6. What documentation is connected to NOX and what is included

     NOX technical file
    7. Shared his screen and showed me a star/delta circuit asked me to identify it and explain its operation and why it’s used
    8. Shared his screen and showed a HV distribution system for passenger ship (Dennis Hall drawing) and to explain it, then quizzed me on harmonic filter and why its there
    9. Asked me about switchboard safeties what we have, just wanted me to tell him didn’t ask to explain any
    10. Asked me a scenario-based question, I am a new 2EO onboard and notice the earth monitoring equipment is turned off, I ask the watchkeeper why and he said chief says to leave it off what your actions are:

     Mentioned speaking to chief to confirm then reasons why and if we can turn it on as its safety critical
    Examiner then says chief is a bit soft and said we can’t because captain doesn’t want to split the distribution system what will you do then

     Said about going to captain with chief for support to explain that this piece of equipment must be on

     If captain refuses contact DPA to let him know
    11. Explain how you would plan works to perform maintenance to a HV/LV transformer

     Use of SMS for switching plan and isolation, using trained personnel as per HV certificates

     Once I got to the point of applying the local earths, he was happy and moved me on
    12. Explain power generation, he said he doesn’t want a simple answer of a primer mover turns an alternator but detail for making the electricity and controlling it:

     Listed the individual components, prime mover, stator, rotor and their construction

     Use of excitation system

     AVR for control
    13. Water product and treatment onboard my roles as a second and maintenance

     Monitoring the condition and quality of water

     Maintaining treatment (chlorine) and recording and testing

     Performing super chlorination
    14. Shared his screen with an old fuel pump, asked me to tell him how I would check the timing

     I asked him if he wanted me to go from isolation etc and he said no I have already done all that, just literally the process for job

     Light obscure method
    15. Showed me indicator cards for early, late and leaky injector and asked me to identify and explain how I know and the reasons for them
    16. Scenario question, I am a second on duty get an alarm for high temperature on the cylinder we had late ignition on what I am thinking

     Said a fire and he asked for my actions
    17. Showed me a Hamworthy sewage treatment plant and asked for explanation of operation
    18. Contractors have been onboard and have changed a compressor on a refrigeration plant, but the plant is not running efficiently what’s my actions and thoughts

     Mentioned checking various components for undercharge etc

     Mentioned air in the system
    19. How can we remove the air from the system

     Process

     Recording in ODS record book
    20. Energy Efficiency design index what is it and how do we try to implement

     Mentioned the regulations

     Appliances and systems we have onboard

     SEEMP
    We then finished and he confirmed I had passed. He then mentioned the question about the earth fault and how it was something he experienced as a survey. Had a little discussion about his experience, he sends an email to confirm your result and finished.

Viewing 1 post (of 1 total)