Viewing 1 post (of 1 total)
  • Author
    Posts
  • #16597
    esailor Team
    Keymaster

    2ND ENGINEER ORALS
    DATE OF EXAM :- 21-AUGUST-2017
    EXAMINER :- DAVID LANGLANDS
    EXAMINEE :- MUHAMMAD WAJAHAT ALI
    PLACE :- PAISLEY
    TIME :- 13:30 PM (1 1/2 HOUR)
    RESULT :- PASS
    Q1 ) TYPE OF SHIP
    Q2 ) TYPE OF MAIN ENGINE ,BHP,BORE,STROKE
    Q3) DRAW STARTING AIR DIAGRAM AND EXPLAIN
    Q4) HOW AUTOMATIC VALVE WOKRS
    Q5) SAFETIES OF STARTING AIR SYSTEM AND COMPRESSOR SAFETIES
    Q6) DRAW POWER CARD ,AND HOW TO CALCULATE POWER OF MAIN ENGINE
    Q7) OVERHAULING OF CYLINER HEAD AND CHECKS
    Q8) PROCEDURE FOR OVERHAULING OF PISTON
    Q9) CHECKS ON PISTON ( GROOVE CLEARANCE,AXIAL CLEARANCE, WEARDOWN,SCUFFING MARKS ETC)
    Q10) BOLT ARRANGEMENT OF PISTON ROD FOOT
    Q11) TOOLS NAME WHICH IS USED FOR PISTON
    Q12) CYLINDER HEAD HYDRAULIC NUTS NOT OPENING ACTIONS ( NUMBER OF BOLTS ON CYLINDER HEAD)
    Q13) LUBE OIL TEST ON BOARD
    Q14) COOLING SYSTEM CHEMICAL DOSING( CHEMICALS NAMES AND VALUES)
    Q15) REGULATION OF FRESH WATER GENERATOR
    Q16) TREATMENT OF FRESH WATER SYSTEM (AND TEST AND VALUES)
    Q17) MATERIAL SEA WATER PIPING SYSTEM AND PROTECTION (HOW TO TACKLE LEAKS AND FUTURE EXPECTANCY OF PIPING SYSTEM
    Q18) MGPS SYSTEM CURRENT VALUES, ANODES MATERIAL
    Q19) HOW STARTING AIR EXPLOSION AND PREVENTION AND SAFETIES
    Q20) HOW TO CONTROL JACKET WATER TEMPERATURE (PID CONTROL )
    Q21) WHAT IS PID CONTROL DEFINE
    Q22) BOILER SURVEY
    Q23) SETTING OF SAFETY VALVE OF BOILER
    Q24) SHIP GROUNDING ( ACTION AND CHECKS IN DETAIL)
    Q25) DRY DOCKING SURVEY
    Q26) HOW TO TAKE PINTLE CLEARANCES( WHAT HOLD RUDDER WEIGHT)
    Q27) HOW TO MEASURE RUDDER DROP ( WEAR DOWN)
    Q28) CHECKS ON RUDDER AND PROPELLER
    Q29) HOW TO MEASURE PROPELLER DROP
    Q30) CYLINDER LINER CALIBRATION AND CHECKS
    Q31) STEERING GEAR TYPE AND SAFETIES
    Q32) STEERING GEAR MOTOR SAFETIES
    Q33) OVERCURRENT PROTECTION ON STEERING MOTOR
    Q34) WHAT HAPPEN IF STEERING MOTOR EXCEEDS ABOVE 200 % CAPACITY
    Q35) SHIP ON UMS PIPE LEAKS DURING NIGHT WHAT WILL HAPPEN
    Q36) HOW AUTOMATIC ISOLATION ACHIEVED
    Q37) UMS CHECKS ( LOG BOOK ENTRIES)
    Q38) CAN A SINGLE PERSON GO TO ENGINE ROOM AT NIGHT ON UMS
    Q39) DRAW STAR DELTA CONNECTION SAFETIES,REASON FOR STAR DELTA
    Q40) WHY REQUIRES INSULATION RESISTANCE TEST , AND VALUES
    Q41) HOW MUCH VOLTAGE REQUIRES FOR TESTING 440 INSULATION,REASON
    Q42) EARTH MONITORING SYSTEM AND ALARM VALUES
    Q43) DRAW CROSS SECTION OF OIL TANKER SHIP
    Q44) WHAT HAPPEN IF DOUBLE BOTTOM TANK SEVERE DAMAGE
    Q45) STRUCTURAL PROTECTION ON ACCOMODATION
    Q46) DEFINE CLASS A60
    Q47) WHAT OTHER FIRE PROTECTION BULKHEAD AND LOCATION
    Q48) HOW TO TACKLE FIRE IF SHIP IS IN DRYDOCK
    Q49) WHY CO2 SYSTEM SYSTEM IS BLANKED( ANY ADDITIONAL FIRE FIGHTING SYSTEM CAN USE ON DRYDOCK)
    Q50) CO2 SYSTEM MAINTENANCE ,CHECKS, HOW TO DETECT LIQUID LEVEL IN CO2 BOTTLES AND HOW TO BLOW LINES .
    Q51) CHANGE OVER PROCEDURE OF LOW SULPHUR FUEL OIL ( TIME REQUIRED )
    Q52) WHY NEED TO CHANGE GRAVITY DISC
    Q53) HOW YOU MEASURE AND CONTROL THE FUEL OIL QUANTITY TO INDIVIDUAL MAIN ENGINE UNIT
    Q54) HOW VIT SYSTEM WORKS ( PARTS AND COMPONENTS)
    Q55) CERTIFICATES ON BOARD
    Q56) CERTIFICATES RELATES TO ISM
    Q57) ASK ABOUT DOC AND SMC
    Q58) WHY PORT STATE CONTROL WHAT THEY WILL CHECK ON SHIP
    Q59) HOW ISM EFFECTS YOU AS A 2ND ENGINEER
    Q60) HOW A TRAIN A ENGINE CADET
    Q61) PRECAUTION TO PREVENT FIRE HAZARDS IN ENGINE ROOM
    Q62) HOW TO OPERATE ENGINE FROM LOCAL CONTROL STATION( PROCEDURE FOR CHANGE OVER)
    FINALLY HE SAID ( CONGRATS YOU PASSED) ….

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.