Viewing 1 post (of 1 total)
  • Author
    Posts
  • #15860
    esailor Team
    Keymaster

    DATE: 21-FEB-2018
    EXAM PERIOD : 1 HR 10 MIN.
    1. INFORMED ABOUT BUILDING FIRE SAFETY. TOLD ORAL EXAM WILL BE AS PER SYLLABUS OF MGN 69
    2. CHECKED ALL MY DOCUMENTS-PASSPORT, CDC, COC AND SEA SERVICE TESTIMONIAL FOR LAST SHIP
    3. WHAT TYPE PF SHIPS YOU SAILED ON
    4. VESSEL IS GOING FOR DRY DOCK IN NEXT 3-4 MONTHS TIME. HOW WILL YOU PREPARE DD SPECIFICATIONS
    5. WHAT ITEMS IN DEFECT LIST
    6. HE WAS PARTICULARLY LOOKING FOR ANY CONDITION OF CLASS
    7. WHAT INFORMATION NEED TO SEND TO DD AS CE POINT OF VIEW
    8. WHAT SPARES YOU WILL ORDER FOR DD
    9. WHAT SPARES IN CASE OF CPP
    10. WHATS IS DOCKING PLAN, WHAT IT CONTENTS
    11. WHY SHELL EXPANSION PLAN & WHAT IT CONTENTS
    12. SHIP REQUIREMENTS/SUPPLIES IN DD
    13. WHAT WILL YOU ENSURE BEFORE TAKING DIFFERENT SUPPLIES FROM DOCK
    14. WHAT CHECKS, 1 MONTH BEFORE VESSEL GO TO LAY UP BERTH
    15. CHECKS BEFORE VESSEL SHIFT ON DOCKING BLOCK
    16. VESSEL IS IN DOCK, WATER HAS STARTED PUMPING OUT, WHAT WILL BE PROCEDURE TO CHANGE OVER TO SHORE POWER
    17. WHAT WILL YOU CHECK BEFORE CONNECTING SHORE POWER?
    18. WHAT IF SUPPLY IS 50 HZ, WILL YOU ACCEPT IT AND WHY
    19. WHAT IF VOLTAGE SUPPLY IS LOWER, WILL YOU ACCEPT IT & WHY
    20. CAN YOU DIRECTLY SWITCH OVER TO SHORE POWER
    21. WHY EARTHING TO SHORE IS REQUIRED
    22. HOW WILL YOU CHECK PHASE SEQUENCE?
    23. WHAT IF PHASE SEQUENCE IS WRONG?
    24. HOW WILL YOU CORRECT IT?
    25. DOE IT MATTER WHICH CABLE TO SWITCH OVER
    26. WATER HAS PUMPED OUT FROM DOCK, YOUR CHECKS?
    27. TAKE ME THROUGH HULL INSPECTION
    28. WHAT DAMAGES YOU MAINLY LOOKING ON SHELL PLATES
    29. CHECKS ON SEA CHEST IN DETAIL
    30. CHECKS ON RUDDER IN DETAIL
    31. CHECKS ON PROPELLER BLADES
    32. WHAT IS CAVITATION DAMAGE
    33. WHAT EXACTLY IS CAVITATION, HOW IT HAPPENS?
    34. HOW WILL YOU COME TO KNOW WHETHER IT IS LONG TERM CAVITATION OR RECENT CAVITATION?
    35. FURTHER CHECKS ON PROPELLER
    36. CHECKS IN CASE OF CONTROLLABLE PITCH PROPELLER
    37. WHAT IS DIFFERENCE BETWEEN ZERO PITCH SETTING AND ZERO THRUST SETTING
    38. CHECKS ON STERN TUBE? LOOKING FOR CONDITION OF ROPE GUARD AND ANY TRAPPED FISH NET, ROPE
    39. MAIN TYPES OF ELECTRICAL FAULTS
    40. WHY EARTH FAULT OCCURS, WHAT HAPPEN EXACTLY IF THERE IS EARTH FAULT
    41. HOW SHORT CIRCUIT WILL OCCUR THEN
    42. WHAT CAN CAUSE OPEN CIRCUIT
    43. WHY DO WE NEED PROTECTION DEVICES IN ELECTRIC DISTRIBUTION SYSTEM?
    44. WHAT IS DANGER TO PERSONAL SAFETY IF THERE IS EARTH FAULT
    45. HOW WILL YOU DETECT AND CLEAR EARTH FAULT?
    46. WHILE TRACING EARTH FAULT, YOU HAVE FOUND THERE IS ONLY SLIGHT CHANGE IN NEEDLE OF MEGA OHM METER ON SWITCH BOARD, WHAT IT INDICATES?
    47. YOU HAVE EARTH FAULT ON 24 V DC SUPPLY, ANY SAFETY HAZARD, AS LEAKING CURRENT IS VERY SMALL?
    48. WHAT IS IT DANGEROUS FOR THEN AND WHY?
    YOU HAVE RETAINED YOUR CERTIFICATE OF COMPETENCY, I AM HAPPY TO GIVE YOU PASS.

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.